Rollouts need cable and hardware on site in time. DemandLabs forecasts materials by item and drafts purchase orders that allow for supplier lead times.

Oct 9, 2026
Fibre rollout planning when homes passed is not homes connected
The weekly build review opens on one number: premises passed against target. The chart is close to plan, the board likes it, and the contractor payments are tied to it. Further down the pack, connection orders in areas that went live last quarter are waiting three weeks for an installer, because installers were moved onto splicing to keep the premises passed line on target. The depot nearest the backlog is short of optical network terminals while another depot holds a pallet of them. The yard behind it has a growing pile of cable offcuts that are too short for any route still to be built.

Aug 22, 2026
Why the plan the system published cannot be built
Material requirements planning has a design assumption that everybody knows and almost nobody accounts for. It assumes infinite capacity.

Aug 23, 2026
Where to hold the buffer, once you accept you cannot hold it everywhere
Set safety stock node by node and every node protects itself against the same uncertainty. The plant holds a buffer because demand is variable. The central warehouse holds a buffer because demand is variable. Each regional site holds a buffer for the same reason. The variability was counted four times and paid for four times, and none of those four decisions was wrong on its own terms.