Automotive OEM Supply Chain Planning

A vehicle plant builds a mix of trims, powertrains and options, and each one calls on a different set of parts. DemandLabs solves the build plan against line capacity and part supply, and prices each fix against the vehicles it protects.

What Shapes Vehicle Manufacturers Planning

A vehicle plant runs at a set line rate, and every gap in parts or crews shows up in the day's output.

Model mix

Trim and Options Decide the Parts

A forecast by model says little about which seats, engines and wiring harnesses the plant needs. Each trim and option choice moves demand to a different set of part numbers and suppliers.

Lineside stock

Little Stock Beside the Line

Many parts arrive in sequence on the day they are fitted. When one is short, the line stops, or vehicles are built without it and parked until the part arrives.

Model change

Launches Overlap With Run-Outs

A new model ramps up while the outgoing one runs out, often on the same line. Old-model parts have to be used up by the last build while the new model's suppliers reach volume.

Solutions for Vehicle Manufacturers

The DemandLabs applications that fit vehicle manufacturers, and how each one handles the planning.

Line rate, crew rosters and changeovers solve with part lead times plant by plant, so the weekly build plan by variant is one the line can run. Rough-cut volumes for S&OP and the detailed plan come from one model.

Explore supply planning

Purchase orders for the coming weeks of builds are ranked by composite supplier and lane risk. Each risky order comes with a priced expedite or re-source, and the vehicles it holds up are listed beside it.

Explore supplier risk

When a part caps output, build plans with different variant mixes are compared on P&L, cash and service, and the one the review picks writes back to the plan of record.

Explore IBP

A new model's launch curve is built from look-alike vehicles with similar attributes. Dealer and fleet orders feed one consensus forecast by variant and region, and each edit from sales or supply is logged with its owner.

Explore demand planning

How Vehicle Manufacturers Planning Connects

Each variant in the build plan links to the parts it uses, the suppliers that ship them and the margin it earns.

Sales

Order Bank

  • Dealer orders
  • Fleet orders
  • Stock vehicles
Product

Variant Mix

  • Trims
  • Powertrains
  • Option packs
Supply

Weekly Build

  • Line rate
  • Shift patterns
  • Model changeovers
Materials

Part Supply

  • Supplier releases
  • Lead times
  • Shortage parts
Finance

Variant Margin

  • Margin by variant
  • Premium freight
  • Run-out stock

Built for Vehicle Manufacturers

OEM planning ties each variant in the mix to the parts the line will fit.

Build Plans the Line Can Run

Line rate, crews and changeovers constrain the same solve as part lead times, so the weekly build fits the plant and its suppliers.

Launch Ramps From Look-Alike Vehicles

A new model starts with a launch curve built on earlier vehicles with similar attributes, before its own orders arrive.

Short Parts Weighed by Margin

When a part runs short, variant mixes are compared on margin, cash and service before the build plan changes.

Alerts Go to the Owning Buyer

A risk alert on a supplier routes to the buyer who owns it, with the vehicles it holds up and a priced expedite attached.

Vehicle Manufacturers Planning FAQs

Can DemandLabs forecast by vehicle variant?

Each variant is an item in the forecast, so it carries its own number by region and customer, built from dealer and fleet orders.

How is a new model forecast before launch?

The launch curve starts from look-alike vehicles with similar attributes, and planners adjust it in the consensus forecast, where each change is logged with its owner.

Can we see which vehicles a late part holds up?

Each part is traced up the bill of materials to the variants that use it, so a late delivery shows the build volume and revenue it puts at risk.

How long does implementation take?

Eight weeks to the first live cycle for one planning area, with a value review with your CFO in week 10.

See Your Build Plan Against Part Supply

A 45-minute walkthrough on your own data.